Live
Sunlight on the sea beyond a dry stone wall, with a line of headlands to the left.
Isle of Man · News & island lifemanx wire.The island’s only wholly Manx-owned news group.
RaaidynPolitics, in Roads & Utilities

Department rules out separate Onchan traffic study, citing wider transport plan

Infrastructure Minister Jason Moorhouse says Mount View Road data does not support road humps, in answers to written Tynwald questions from Rob Callister MHK.

Share & save this story

FacebookWhatsApp

Sharing to Instagram

Use your phone’s share menu and choose Instagram if offered. Otherwise, we’ll download a headline card and copy the story link for you to add in Instagram. Add the link as a sticker or paste it into a message.

Manx Wire · https://manxwire.im/roads/2026-11-16-department-rules-out-separate-onchan-traffic-study-citing-wider/

Turquoise water, a sandy beach with a striped lighthouse and beach huts, and the green hill of Bradda curving round Port Erin Bay.
Port Erin Bay from above. Photo: Chris Morgan, CC BY-SA 2.0

The Department of Infrastructure has ruled out a standalone traffic study for Onchan, saying congestion in the village should be assessed as part of a wider transport plan, according to Isle of Man Today.

Onchan MHK Rob Callister had raised congestion in the village centre and at Signpost Corner, and road safety on Mount View Road, in three written Tynwald questions. Infrastructure Minister Jason Moorhouse said an isolated study “may not fully account for the effects of changes elsewhere on the network”.

Instead, the department is relying on an all-Island Transport Model it has commissioned, which is designed to assess traffic flows now and in future and to test how changes to the road network would play out. Mr Moorhouse said the department would seek money in 2027/28 for an Urban Area Transport Investment Masterplan covering Douglas, Onchan and Braddan.

He said that work would provide evidence on whether improvements were needed at Signpost Corner and Hillberry Road. Any measures it identified would then have to go through appraisal, prioritisation and funding approval before being carried out, he said.

On Mount View Road, the minister said the Constabulary’s collision database recorded no injury collisions on the road between 3 May 2025 and 3 November 2026. The department’s own speed checks recorded an average of 19.39mph at the western end and 16.3mph at the eastern end.

On that evidence, Mr Moorhouse said the department did not consider road humps or other physical traffic-calming measures to be justified at present. He said the department worked with the police when speeding concerns were raised, could consider extra targeted enforcement or speed indicator devices where appropriate, and would continue to look at any new evidence about safety on the road.

  • Onchan
  • Roads
  • Tynwald
  • Department of Infrastructure
  • Traffic
Comments: read or add yours

Have your say

0 comments · Community guidelines

    No comments yet. Start the cooish.